Pepper Cove Phase 2

Pepper Cove Phase 2 is a proposed 37-lot residential subdivision located on the City's west side north of CR 375 N and west of Froberg Road.  Olthoff Homes LLC is the developer.

Water main infrastructure plans were approved at the 04/09/19 VCU Board Meeting.  Reichelt Plumbing, Inc. will install the Infrastructure which will consist of:

  • 2,717 linear feet of 8" ductile iron water main
  • 6 fire hydrant assemblies
  • 52 - 1" water services

Construction plans for the sanitary and storm sewer systems were approved at the 04/23/19 VCU Board Meeting and will include:

  • 1,977 feet of 8" diameter gravity sanitary sewer
  • 14 manholes

The sanitary sewer will connect into the lift station which was constructed as part of th4e Pepper Cove Phase 1 subdivision.


The storm sewer infrastructure will include:

  • 2,058 feet of 12" diameter sewer
  • 596 feet of 15" diameter sewer
  • 391 feet of 18" diameter sewer
  • 455 feet of 24" diameter sewer
  • 717 feet of 27" diameter sewer
  • 56 storm structures